Development of feasibility studies for land development. Analysis and design of the site layout, site grading activities, detention pond, and utility locations. (Spring [As Needed]) [Graded (Standard Letter)]
Prerequisite(s):CCET 3670- Prerequisite Min. Grade: D- Prerequisite Can Be Concurrent? Yes